We were contracted to create a factory lighting design and power system, installing LED light fixtures to suit the updated factory layout. The project duration was 4 weeks in which we had to strip the old system and install new wiring and an updated distribution board.
The main reason for the fitout was because the client wanted quality commercial LED ceiling light fixtures with daylight colour for improved work processes. The lighting would help the workers to spot product defects and imperfections.
After stripping out the existing services, we installed new electrical lighting, circuits and wiring, connecting them to the distribution board. We carried out thorough testing for safety, ensuring optimum functionality and visibility with the finished product.